Slide 27 of 173
Notes:
The gate delay, or transitional delay fault model, was the first delay fault model to be developed and is also the simplest. The transitional fault model can be modeled as a temporary stuck-at fault, and tests for it can be developed using this model. Again, the major disadvantage is the complexity of the test generation process and the fact that determining the minimum delay size that can be detected is difficult.